Cecon ASA had its first full year of operation in 2005.

In addition to the pipeline projects, Cecon personnel have carried out a number of marine operation projects including heavy lifts, mooring offloading platforms and vessels (buoy systems), tow outs, etc. These projects have included piling and swaging, installation of suction anchors and drag anchors, installation of chain and wires, mooring buoys, risers, templates, etc.

The following projects have been carried out by Cecon:

Project

Description

Client

Year

Canucu FPSO, Angola

3 off 3 km 4 inch Gaslift lines

ADC

2005

Canuca FPSO, Angola

33 km 6 inch flowline + 22 km 4 inch pipelines

ADC

2006

Morsa West, Angola

40 km power cables and umbilicals

ADC

2007

Kristin, Norway

550 m loading hose

Statoil

2007

Lombo, Angola

15 km 6 inch flowline and two 7.5 inch.

ADC

2008

Okoro, Nigeria

Three1 km flexible lines (4, 6, 8 inch)

Deepflex

2008

Kristin, Norway

2600 m loading hose

Statoil

2008

Pacassa, Angola

10 km rigid pipeline

ADC

2009

Canucu, Angola

Recovery of coiled tubing, umbilicals and flexible

ADC

2009

 

Cecon ASA