Track Record
Cecon ASA had its first full year of operation in 2005.
In addition to the pipeline projects, Cecon personnel have carried out a number of marine operation projects including heavy lifts, mooring offloading platforms and vessels (buoy systems), tow outs, etc. These projects have included piling and swaging, installation of suction anchors and drag anchors, installation of chain and wires, mooring buoys, risers, templates, etc.
The following projects have been carried out by Cecon:
|
Project |
Description |
Client |
Year |
|
Canucu FPSO, Angola |
3 off 3 km 4 inch Gaslift lines |
ADC |
2005 |
|
Canuca FPSO, Angola |
33 km 6 inch flowline + 22 km 4 inch pipelines |
ADC |
2006 |
|
Morsa West, Angola |
40 km power cables and umbilicals |
ADC |
2007 |
|
Kristin, Norway |
550 m loading hose |
Statoil |
2007 |
|
Lombo, Angola |
15 km 6 inch flowline and two 7.5 inch. |
ADC |
2008 |
|
Okoro, Nigeria |
Three1 km flexible lines (4, 6, 8 inch) |
Deepflex |
2008 |
|
Kristin, Norway |
2600 m loading hose |
Statoil |
2008 |
|
Pacassa, Angola |
10 km rigid pipeline |
ADC |
2009 |
|
Canucu, Angola |
Recovery of coiled tubing, umbilicals and flexible |
ADC |
2009 |