|
|
 Flexible gas lines onboard Bourbon Borgsten |
 Pipe pull-in to FPSO |
 Concrete mattresses for stabilization of lines |
CANUKU GAS LIFT PROJECT
Installation of 3 x 3km 4 inch flexible gas lift lines installed from the FPSO “Ocean Producer” to the Canuku Field in Angola.
Vessel “Bourbon Borgsten” chartered for the project
|
|
|
Visit of Oil- and Energy Minister to Cecon.
.jpg) The Oil- and Energy Minister, together with a delegation from the Ministry visited Cecon and was briefed on current activities. The visit was in connection with a series of visits to the industry in preparation of a paper on future oil- and gas activities.
Read more...
|
EXECUTIVE APPOINTMENTS
Cecon is pleased to announce the following appointments:
- Morten Kilen (43) is appointed Operations Director in Cecon ASA.
- Andrew Towler (50) is appointed Business Development Director in Cecon ASA, currently based in Perth, Australia.
- Jørn Otto Gundersen (47) is appointed Commercial Director in Cecon ASA.
Read more...
|
|
|